WellplannerNorwegian shelf well data

Fields / Frigg / 25/1-A-3

25/1-A-3

Development, productionPlugged and abandonedWater

Drilled by Elf Petroleum Norge AS with Frigg Dp2 in Frigg, 13.09.1978 to 01.04.1979 (200 days), to 2 195,0 m.

Water depth98,0 m
Total depth2 195,0 m MD
Vertical depth1 924,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table43,0 m
Formation at total depth-
RigFrigg Dp2
Spud13.09.1978
Completed01.04.1979
OperatorElf Petroleum Norge AS
Position59,8860 N, 2,0724 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Frigg gradient23,0 °C/km
Estimated at total depth from the gradient45 °C

The gradient is the median of 7 released wells in Frigg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/1-A-20,02 146,0--1978
25/1-A-3 A same well0,02 562,0--1987
25/1-A-10,02 111,0--1978
25/1-A-50,02 030,0--1978
25/1-A-70,02 034,0--1978
25/1-A-60,02 108,0--1978
25/1-A-40,02 104,0--1978
25/1-A-4 A0,02 844,0--1989

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗