25/10-A-1 AH
Development, productionWill never be drilled
A planned wellbore in Hanz that the register says will never be drilled.
Water depth115,3 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud-
Completed-
OperatorAker BP ASA
Position59,0555 N, 2,2441 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Hanz report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/10-A-1 H same well | 0,0 | 2 080,0 | - | - | 2023 |
| 25/10-U-8 | 0,0 | 1 190,0 | - | - | 2022 |
| 25/10-C-1 H | 0,0 | 5 200,0 | - | - | 2023 |
| 25/10-B-1 AH | 0,0 | 5 104,0 | - | - | 2023 |
| 25/10-B-1 H | 0,0 | 3 077,0 | - | - | 2023 |
| 25/10-U-4 | 1,8 | - | - | - | - |
| 25/10-U-5 | 1,8 | - | - | - | - |
| 25/10-U-6 | 1,8 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.