Fields / Balder / 25/11-A-20 H
25/11-A-20 H
Development, injectionPluggedDry
Drilled by Esso Exploration and Production Norway A/S with DEEPSEA BERGEN decom in Balder, 16.06.2001 to 12.07.2001 (26 days), to 5 086,0 m.
Water depth126,0 m
Total depth5 086,0 m MD
Vertical depth1 828,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud16.06.2001
Completed12.07.2001
OperatorEsso Exploration and Production Norway A/S
Position59,1910 N, 2,3601 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 61 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-A-20 AH same well | 0,0 | 4 356,0 | - | - | 2001 |
| 25/11-A-6 AH | 0,0 | 3 614,0 | - | - | 2001 |
| 25/11-A-6 H | 0,0 | 1 807,0 | - | - | 1996 |
| 25/11-A-4 AH | 0,0 | 2 122,0 | - | - | 1996 |
| 25/11-A-4 BH | 0,0 | 2 923,0 | - | - | 2001 |
| 25/11-A-4 CH | 0,0 | 3 700,0 | - | - | 2001 |
| 25/11-A-4 H | 0,0 | 2 324,0 | - | - | 1996 |
| 25/11-A-22 AH | 0,1 | 3 551,0 | - | - | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.