Fields / Balder / 25/11-A-23 H
25/11-A-23 H
Development, productionProducing and injectingOil
Drilled by ExxonMobil Exploration and Production Norway AS with West Alpha in Balder, 01.03.2013 to 18.11.2013 (262 days), to 3 492,0 m.
Water depth126,0 m
Total depth3 492,0 m MD
Vertical depth1 765,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table18,0 m
Formation at total depth-
RigWest Alpha
Spud01.03.2013
Completed18.11.2013
OperatorExxonMobil Exploration and Production Norway AS
Position59,1913 N, 2,3577 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-A-21 AH | 0,0 | 2 764,0 | - | - | 2013 |
| 25/11-A-21 H | 0,0 | 2 449,0 | - | - | 2013 |
| 25/11-A-27 AH | 0,0 | 4 125,0 | - | - | 2015 |
| 25/11-A-27 H | 0,0 | 3 592,0 | - | - | 2015 |
| 25/11-A-22 AH | 0,1 | 3 551,0 | - | - | 2013 |
| 25/11-A-22 H | 0,1 | 3 399,0 | - | - | 2013 |
| 25/11-A-19 AH | 0,1 | 3 791,0 | - | - | 2001 |
| 25/11-A-19 H | 0,1 | 3 660,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.