Fields / Balder / 25/11-B-18 H
25/11-B-18 H
Development, productionClosedOil
Drilled by Esso Exploration and Production Norway A/S with DEEPSEA BERGEN decom in Balder, 26.01.2001 to 22.02.2001 (27 days), to 3 020,0 m.
Water depth127,0 m
Total depth3 020,0 m MD
Vertical depth1 750,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud26.01.2001
Completed22.02.2001
OperatorEsso Exploration and Production Norway A/S
Position59,1776 N, 2,3795 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 58 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-B-7 AH | 0,0 | 2 891,0 | - | - | 1997 |
| 25/11-B-7 H | 0,0 | 2 362,0 | - | - | 1996 |
| 25/11-B-26 H | 0,1 | - | - | - | - |
| 25/11-B-24 AH | 0,1 | 4 100,0 | - | - | 2013 |
| 25/11-B-24 H | 0,1 | 4 006,0 | - | - | 2013 |
| 25/11-B-11 H | 0,1 | 2 934,0 | - | - | 1998 |
| 25/11-B-14 AH | 0,1 | 2 695,0 | - | - | 1998 |
| 25/11-B-14 H | 0,1 | 2 167,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.