Fields / Balder / 25/11-C-3 DH
25/11-C-3 DH
Development, observationPlugged
Drilled by Esso Exploration and Production Norway A/S with DEEPSEA BERGEN decom in Balder, 09.01.2001 to 14.01.2001 (5 days), to 2 735,0 m.
Water depth127,0 m
Total depth2 735,0 m MD
Vertical depth1 856,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud09.01.2001
Completed14.01.2001
OperatorEsso Exploration and Production Norway A/S
Position59,1835 N, 2,4090 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 62 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-C-3 AH same well | 0,0 | 2 273,0 | - | - | 1997 |
| 25/11-C-3 BH same well | 0,0 | 2 118,0 | - | - | 1997 |
| 25/11-C-3 CH same well | 0,0 | 3 024,0 | - | - | 2000 |
| 25/11-C-3 EH same well | 0,0 | 3 187,0 | - | - | 2001 |
| 25/11-C-3 FH same well | 0,0 | 3 452,0 | - | - | 2001 |
| 25/11-C-3 H same well | 0,0 | 2 180,0 | - | - | 1996 |
| 25/11-C-13 H | 0,0 | 2 725,0 | - | - | 1997 |
| 25/11-C-12 H | 0,1 | 2 267,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.