WellplannerNorwegian shelf well data

Fields / Balder / 25/11-D-1 H

25/11-D-1 H

Development, injectionClosedGas

Drilled by Esso Exploration and Production Norway A/S with West Alpha in Balder, 25.05.1996 to 15.07.1996 (51 days), to 2 525,0 m.

Water depth127,7 m
Total depth2 525,0 m MD
Vertical depth1 842,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table18,0 m
Formation at total depth-
RigWest Alpha
Spud25.05.1996
Completed15.07.1996
OperatorEsso Exploration and Production Norway A/S
Position59,2003 N, 2,4103 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient62 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-D-10 AH0,03 060,0--1998
25/11-D-10 BH0,02 941,0--1998
25/11-D-10 H0,02 496,0--1998
25/11-D-25 H0,02 657,0--2014
25/11-D-21 H0,0----
25/11-D-2 AH0,12 773,0--1996
25/11-D-2 H0,12 330,0--1996
25/11-D-26 AH0,13 436,0--2015

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗