WellplannerNorwegian shelf well data

Fields / Balder / 25/11-DT-1 Y1H

25/11-DT-1 Y1H

Development, productionProducingOil

Drilled by Vår Energi ASA with West Phoenix in Balder, 27.12.2022 to 13.05.2023 (137 days), to 3 705,0 m.

Water depth127,0 m
Total depth3 705,0 m MD
Vertical depth1 785,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud27.12.2022
Completed13.05.2023
OperatorVår Energi ASA
Position59,1999 N, 2,4130 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient59 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-DT-1 Y2H same well0,03 989,0--2023
25/11-DT-4 H0,03 122,0--2022
25/11-DT-2 H0,02 769,0--2022
25/11-DT-3 H0,04 482,0--2023
25/11-D-21 H0,1----
25/11-D-25 H0,12 657,0--2014
25/11-D-26 AH0,23 436,0--2015
25/11-D-26 H0,22 873,0--2014

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗