25/11-G-14
Development, injectionClosedWater
Drilled by Norsk Hydro Produksjon AS with Grane in Grane, 02.03.2004 to 18.03.2004 (16 days), to 1 507,0 m.
Water depth127,5 m
Total depth1 507,0 m MD
Vertical depth1 059,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud02.03.2004
Completed18.03.2004
OperatorNorsk Hydro Produksjon AS
Position59,1653 N, 2,4873 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 41 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-10 AY1 | 0,0 | 3 180,0 | - | - | 2019 |
| 25/11-G-10 AY2 | 0,0 | 2 926,0 | - | - | 2019 |
| 25/11-G-10 AY3 | 0,0 | 3 574,0 | - | - | 2019 |
| 25/11-G-10 Y1 | 0,0 | 4 300,0 | - | - | 2005 |
| 25/11-G-10 Y2 | 0,0 | 4 316,0 | - | - | 2006 |
| 25/11-G-18 | 0,0 | 4 616,0 | - | - | 2002 |
| 25/11-G-18 AY1 | 0,0 | 3 415,0 | - | - | 2016 |
| 25/11-G-18 AY2 | 0,0 | 4 180,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.