Fields / Grane / 25/11-G-15 AY2

25/11-G-15 AY2

Development, productionPluggedOil

Drilled by StatoilHydro Petroleum AS with Grane in Grane, 05.01.2009 to 29.01.2009 (24 days), to 5 180,0 m.

Water depth127,5 m
Total depth5 180,0 m MD
Vertical depth1 812,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud05.01.2009
Completed29.01.2009
OperatorStatoilHydro Petroleum AS
Position59,1653 N, 2,4873 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Grane gradient42,7 °C/km
Estimated at total depth from the gradient73 °C

The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-G-15 same well0,02 500,0--2008
25/11-G-15 AY1 same well0,03 311,0--2008
25/11-G-15 AY3 same well0,04 857,0--2009
25/11-G-15 B same well0,02 305,0--2020
25/11-G-15 C same well0,04 282,0--2020
25/11-G-15 DY1 same well0,03 835,0--2020
25/11-G-15 DY2 same well0,0----
25/11-G-15 DY3 same well0,04 650,0--2020