Fields / Grane / 25/11-G-2 DY3
25/11-G-2 DY3
Development, productionClosed
Drilled by Equinor Energy AS with Grane in Grane, 24.02.2026 to 25.02.2026 (1 days), to 4 515,0 m.
Water depth127,5 m
Total depth4 515,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud24.02.2026
Completed25.02.2026
OperatorEquinor Energy AS
Position59,1653 N, 2,4872 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 188 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-2 A same well | 0,0 | 4 124,0 | - | - | 2015 |
| 25/11-G-2 BY1 same well | 0,0 | 5 413,0 | - | - | 2015 |
| 25/11-G-2 BY2 same well | 0,0 | 5 520,0 | - | - | 2015 |
| 25/11-G-2 BY3 same well | 0,0 | 4 719,0 | - | - | 2015 |
| 25/11-G-2 C same well | 0,0 | 5 189,0 | - | - | 2025 |
| 25/11-G-2 DY1 same well | 0,0 | 5 342,0 | - | - | 2026 |
| 25/11-G-2 DY2 same well | 0,0 | 5 598,0 | - | - | 2026 |
| 25/11-G-2 Y1 same well | 0,0 | 5 072,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.