25/11-G-20 A
Development, injectionClosedGas
Drilled by Norsk Hydro Produksjon AS with Scarabeo 6 in Grane, 23.04.2002 to 26.05.2002 (33 days), to 3 400,0 m.
Water depth127,5 m
Total depth3 400,0 m MD
Vertical depth1 733,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud23.04.2002
Completed26.05.2002
OperatorNorsk Hydro Produksjon AS
Position59,1653 N, 2,4874 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 71 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-20 same well | 0,0 | 2 266,0 | - | - | 2002 |
| 25/11-G-20 B same well | 0,0 | 2 815,0 | - | - | 2026 |
| 25/11-G-16 AY1 | 0,0 | 4 797,0 | - | - | 2017 |
| 25/11-G-16 AY2 | 0,0 | 4 515,0 | - | - | 2017 |
| 25/11-G-16 AY3 | 0,0 | 3 954,0 | - | - | 2017 |
| 25/11-G-16 Y1 | 0,0 | 3 245,0 | - | - | 2008 |
| 25/11-G-16 Y2 | 0,0 | 4 521,0 | - | - | 2008 |
| 25/11-G-16 Y3 | 0,0 | 4 608,0 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.