Fields / Grane / 25/11-G-25 BY2
25/11-G-25 BY2
Development, productionProducing
Drilled by Equinor Energy AS with Grane in Grane, 23.08.2023 to 26.09.2023 (34 days), to 4 758,0 m.
Water depth127,5 m
Total depth4 758,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table70,0 m
Formation at total depth-
RigGrane
Spud23.08.2023
Completed26.09.2023
OperatorEquinor Energy AS
Position59,1652 N, 2,4874 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 199 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-25 same well | 0,0 | 4 090,0 | - | - | 2002 |
| 25/11-G-25 AY1 same well | 0,0 | 4 454,0 | - | - | 2015 |
| 25/11-G-25 AY2 same well | 0,0 | 4 485,0 | - | - | 2015 |
| 25/11-G-25 AY3 same well | 0,0 | 4 454,0 | - | - | 2015 |
| 25/11-G-25 BY1 same well | 0,0 | 3 877,0 | - | - | 2023 |
| 25/11-G-25 BY3 same well | 0,0 | 4 423,0 | - | - | 2023 |
| 25/11-G-21 | 0,0 | 2 773,0 | - | - | 2001 |
| 25/11-G-21 A | 0,0 | 3 476,0 | - | - | 2012 |
Casing and formation tests
No casing programme is reported for this wellbore.