WellplannerNorwegian shelf well data

Fields / Grane / 25/11-G-38 AY3

25/11-G-38 AY3

Development, productionPluggedOil

Drilled by Statoil Petroleum AS with Grane in Grane, 10.05.2011 to 19.05.2011 (9 days), to 7 083,0 m.

Water depth127,5 m
Total depth7 083,0 m MD
Vertical depth1 811,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud10.05.2011
Completed19.05.2011
OperatorStatoil Petroleum AS
Position59,1652 N, 2,4875 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Grane gradient42,7 °C/km
Estimated at total depth from the gradient73 °C

The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-G-38 same well0,04 383,0--2010
25/11-G-38 AY1 same well0,06 430,0--2011
25/11-G-38 AY2 same well0,06 780,0--2011
25/11-G-38 AY4 same well0,0----
25/11-G-38 BY1 same well0,05 587,0--2022
25/11-G-38 BY2 same well0,06 985,0--2024
25/11-G-38 BY3 same well0,06 631,0--2024
25/11-G-340,03 893,0--2005

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗