25/11-G-6
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Grane in Grane, 09.04.2004 to 12.08.2004 (125 days), to 4 335,0 m.
Water depth128,0 m
Total depth4 335,0 m MD
Vertical depth1 826,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud09.04.2004
Completed12.08.2004
OperatorNorsk Hydro Produksjon AS
Position59,1653 N, 2,4872 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 73 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-6 AY1 same well | 0,0 | 4 620,0 | - | - | 2016 |
| 25/11-G-6 AY2 same well | 0,0 | 4 165,0 | - | - | 2016 |
| 25/11-G-6 AY3 same well | 0,0 | 4 522,0 | - | - | 2016 |
| 25/11-G-2 A | 0,0 | 4 124,0 | - | - | 2015 |
| 25/11-G-2 BY1 | 0,0 | 5 413,0 | - | - | 2015 |
| 25/11-G-2 BY2 | 0,0 | 5 520,0 | - | - | 2015 |
| 25/11-G-2 BY3 | 0,0 | 4 719,0 | - | - | 2015 |
| 25/11-G-2 C | 0,0 | 5 189,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.