25/11-G-8
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Grane in Grane, 10.09.2005 to 20.11.2005 (71 days), to 5 259,0 m.
Water depth128,0 m
Total depth5 259,0 m MD
Vertical depth1 819,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud10.09.2005
Completed20.11.2005
OperatorNorsk Hydro Produksjon AS
Position59,1653 N, 2,4873 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 73 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-8 A same well | 0,0 | 4 030,0 | - | - | 2015 |
| 25/11-G-8 BY1 same well | 0,0 | 3 469,0 | - | - | 2015 |
| 25/11-G-8 BY2 same well | 0,0 | 4 121,0 | - | - | 2015 |
| 25/11-G-12 AY1 | 0,0 | 4 619,0 | - | - | 2016 |
| 25/11-G-12 AY2 | 0,0 | 4 764,0 | - | - | 2016 |
| 25/11-G-12 Y1 | 0,0 | 4 245,0 | - | - | 2006 |
| 25/11-G-12 Y2 | 0,0 | 4 286,0 | - | - | 2006 |
| 25/11-G-7 | 0,0 | 4 743,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.