25/11-G-9
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Grane in Grane, 28.03.2004 to 18.05.2004 (51 days), to 3 450,0 m.
Water depth127,5 m
Total depth3 450,0 m MD
Vertical depth1 872,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table69,9 m
Formation at total depth-
RigGrane
Spud28.03.2004
Completed18.05.2004
OperatorNorsk Hydro Produksjon AS
Position59,1653 N, 2,4872 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Grane gradient | 42,7 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 4 released wells in Grane with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-G-9 AY1 same well | 0,0 | 4 090,0 | - | - | 2018 |
| 25/11-G-9 AY2 same well | 0,0 | - | - | - | - |
| 25/11-G-9 AY3 same well | 0,0 | - | - | - | - |
| 25/11-G-9 BY1 same well | 0,0 | 3 951,0 | - | - | 2021 |
| 25/11-G-9 BY2 same well | 0,0 | 3 416,0 | - | - | 2021 |
| 25/11-G-9 BY3 same well | 0,0 | 3 414,0 | - | - | 2022 |
| 25/11-G-5 | 0,0 | 4 005,0 | - | - | 2004 |
| 25/11-G-5 A | 0,0 | 2 485,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.