25/11-I-1 H
Development, injectionClosedWater
Drilled by Vår Energi ASA with West Phoenix in Balder, 22.06.2024 to 13.07.2024 (21 days), to 2 941,0 m.
Water depth127,0 m
Total depth2 941,0 m MD
Vertical depth2 062,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud22.06.2024
Completed13.07.2024
OperatorVår Energi ASA
Position59,2355 N, 2,3521 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 68 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-23 | 0,1 | 2 014,0 | - | 1,34 | 1999 |
| 25/11-E-29 AH | 1,8 | 2 920,0 | - | - | 2015 |
| 25/11-E-29 H | 1,8 | 2 404,0 | - | - | 2015 |
| 25/11-U-44 | 2,3 | 149,1 | - | - | 1999 |
| 25/11-U-45 | 2,3 | 148,4 | - | - | 1999 |
| 25/10-3 | 2,6 | 1 921,0 | 63 °C | - | 1970 |
| 25/7-U-1 | 3,0 | 520,0 | - | - | 2020 |
| 25/7-9 S | 3,0 | 1 980,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.