Fields / 25/11-U-14
25/11-U-14
Other, soil drillingPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 131,8 m.
Water depth128,8 m
Total depth131,8 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2506 N, 2,4389 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-16 | 0,5 | 130,7 | - | - | 1999 |
| 25/11-U-15 | 0,5 | 131,6 | - | - | 1999 |
| 25/11-U-13 | 1,0 | 132,5 | - | - | 1999 |
| 25/11-U-17 | 1,0 | 130,7 | - | - | 1999 |
| 25/11-U-12 | 1,0 | 132,6 | - | - | 1999 |
| 25/11-U-32 | 1,2 | 132,4 | - | - | 1999 |
| 25/11-U-33 | 1,2 | 132,3 | - | - | 1999 |
| 25/11-GT-3 H | 1,4 | 3 534,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.