WellplannerNorwegian shelf well data

Fields / Heimdal / 25/4-1

25/4-1

Exploration, wildcatPlugged and abandonedOil and gas

Drilled by Elf Petroleum Norge AS with Neptune 7 in Heimdal, 01.07.1972 to 09.12.1972 (161 days), to 4 060,0 m in the Smith Bank Formation.

Water depth122,0 m
Total depth4 060,0 m MD
Vertical depth-
Bottom-hole temperature130 °C
Max inclination5,0°
Rotary table23,0 m
Formation at total depthSmith Bank Formation
RigNeptune 7
Spud01.07.1972
Completed09.12.1972
OperatorElf Petroleum Norge AS
Position59,5742 N, 2,2229 E

Formations

28 tops reported, measured depth in metres.

GroupsNordland Group, top 145,0 mNordland GpHordaland Group, top 826,0 mHordaland GpRogaland Group, top 1 926,0 mRogaland GpShetland Group, top 2 620,0 mShetland GpViking Group, top 3 171,0 mVestland Group, top 3 185,0 mStatfjord Group, top 3 292,0 mStatfjord GpNo Group Defined, top 3 512,5 mNo Gp DefinedFormationsUtsira Formation, top 381,0 mNo Formal Name, top 423,0 mNo Formal NameSkade Formation, top 1 000,0 mNo Formal Name, top 1 080,0 mNo Formal NameGrid Formation, top 1 317,0 mNo Formal Name, top 1 330,0 mNo Formal NameBalder Formation, top 1 926,0 mSele Formation, top 1 972,0 mLista Formation, top 2 027,0 mHeimdal Formation, top 2 067,0 mHeimdal FmLista Formation, top 2 423,0 mLista FmVåle Formation, top 2 570,0 mJorsalfare Formation, top 2 620,0 mKyrre Formation, top 2 721,0 mKyrre FmTryggvason Formation, top 3 062,0 mBlodøks Formation, top 3 154,0 mDraupne Formation, top 3 171,0 mHugin Formation, top 3 185,0 mSleipner Formation, top 3 190,0 mSleipner FmSmith Bank Formation, top 3 512,5 mSmith Bank Fm1451 0002 0003 0004 0004 060

Temperature

Reported at total depth130 °C
Heimdal gradient32,2 °C/km
Estimated at total depth from the gradient130 °C

The gradient is the median of 3 released wells in Heimdal with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/4-A-10,3460,0--1985
25/4-A-100,32 345,0--1985
25/4-A-110,32 159,0--1985
25/4-A-20,32 152,0--1985
25/4-A-30,32 228,0--1985
25/4-A-70,32 187,0--1985
25/4-A-80,32 456,0--1985
25/4-A-90,32 187,0--1985

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"181,036"182,0-
Surface casing20"442,026"450,0-
Intermediate13 3/8"1 917,017 1/2"1 920,0-
Intermediate9 5/8"2 942,012 1/4"2 950,0-
Liner7"3 524,08 1/2"3 524,0-

Mud weight

5 measurements, one dot each, 1,00 to 2,10 g/cm³ against measured depth, seawater.

1,01,21,41,61,82,02,201 0002 0003 0004 000170,0 m: 1,05 g/cm³, seawater450,0 m: 1,15 g/cm³, seawater1 800,0 m: 1,25 g/cm³, seawater2 800,0 m: 1,25 g/cm³, seawater3 500,0 m: 2,10 g/cm³, seawater

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
33 179,0 - 3 184,025,4--74180 000
23 208,0 - 3 213,0-----
13 300,0 - 3 314,0-----
Show on the mapOpen on FactPages ↗