25/4-13 S
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Aker BP ASA with Deepsea Stavanger in Alvheim, 06.06.2018 to 28.09.2018 (114 days), to 2 653,0 m in the Heimdal Formation.
Water depth121,0 m
Total depth2 653,0 m MD
Vertical depth2 183,0 m TVD
Bottom-hole temperature-
Max inclination54,2°
Rotary table30,0 m
Formation at total depthHeimdal Formation
RigDeepsea Stavanger
Spud06.06.2018
Completed28.09.2018
OperatorAker BP ASA
Position59,5109 N, 2,0747 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 69 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/4-13 A same well | 0,0 | 2 641,0 | - | 1,37 | 2018 |
| 25/4-12 A | 0,0 | - | - | - | - |
| 25/4-12 S | 0,0 | 525,0 | - | - | 2018 |
| 25/4-8 | 0,8 | 2 286,0 | - | 1,28 | 2003 |
| 25/4-3 | 1,0 | 2 714,0 | 70 °C | 1,23 | 1974 |
| 25/4-B-1 AY1H | 2,4 | 6 050,0 | - | - | 2023 |
| 25/4-B-1 AY2H | 2,4 | 6 050,0 | - | - | 2023 |
| 25/4-B-1 AY3H | 2,4 | 6 270,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 212,0 | 36" | 214,0 | - |
| Surface casing | 13 3/8" | 1 027,5 | 17 1/2" | 1 037,0 | 1,53 LOT |
| Liner | 9 5/8" | 2 451,0 | 12 1/2" | 2 462,0 | 1,60 FIT |
| Open hole | - | 2 653,0 | 8 1/2" | 2 653,0 | - |
Mud weight
6 measurements, one dot each, 1,20 to 1,39 g/cm³ against measured depth, oil, water.