25/4-14 A
Development, observationPlugged and abandoned
Drilled by Aker BP ASA with Deepsea Stavanger in Alvheim, 10.09.2019 to 16.09.2019 (6 days), to 3 015,0 m.
Water depth122,0 m
Total depth3 015,0 m MD
Vertical depth2 328,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Stavanger
Spud10.09.2019
Completed16.09.2019
OperatorAker BP ASA
Position59,5726 N, 2,0751 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 73 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/4-14 B same well | 0,0 | 4 018,0 | - | - | 2019 |
| 25/4-14 S same well | 0,0 | 3 200,0 | - | - | 2019 |
| 25/4-J-2 H | 1,4 | 1 180,0 | - | - | 2006 |
| 25/4-J-1 AH | 1,4 | 2 252,0 | - | - | 2006 |
| 25/4-J-1 H | 1,4 | 1 176,0 | - | - | 2006 |
| 25/4-L-4 H | 1,6 | 4 547,0 | - | - | 2014 |
| 25/4-L-2 Y1H | 1,6 | 6 167,0 | - | - | 2010 |
| 25/4-L-2 Y2H | 1,6 | 5 143,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.