25/4-A-6
Development, productionPlugged and abandonedGas
Drilled by Elf Petroleum Norge AS with Heimdal in Heimdal, 03.06.1985 to 03.08.1985 (61 days), to 2 320,0 m.
Water depth120,2 m
Total depth2 320,0 m MD
Vertical depth2 319,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,5 m
Formation at total depth-
RigHeimdal
Spud03.06.1985
Completed03.08.1985
OperatorElf Petroleum Norge AS
Position59,5743 N, 2,2292 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heimdal gradient | 32,2 °C/km |
| Estimated at total depth from the gradient | 73 °C |
The gradient is the median of 3 released wells in Heimdal with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.