Fields / Alvheim / 25/4-L-5 CY2H
25/4-L-5 CY2H
Development, productionProducingOil
Drilled by Aker BP ASA with Deepsea Nordkapp in Alvheim, 18.12.2023 to 05.01.2024 (18 days), to 6 278,0 m.
Water depth120,0 m
Total depth6 278,0 m MD
Vertical depth2 163,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud18.12.2023
Completed05.01.2024
OperatorAker BP ASA
Position59,5862 N, 2,0886 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 68 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/4-L-5 AH same well | 0,0 | 2 845,0 | - | - | 2023 |
| 25/4-L-5 BH same well | 0,0 | 3 548,0 | - | - | 2023 |
| 25/4-L-5 CY1H same well | 0,0 | 2 245,0 | - | - | 2023 |
| 25/4-L-5 H same well | 0,0 | 2 392,0 | - | - | 2023 |
| 25/4-L-3 AY1H | 0,1 | 5 451,0 | - | - | 2011 |
| 25/4-L-3 AY2H | 0,1 | 5 807,0 | - | - | 2011 |
| 25/4-L-3 H | 0,1 | 3 326,0 | - | - | 2010 |
| 25/4-L-1 AH | 0,1 | 3 669,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.