WellplannerNorwegian shelf well data

Fields / Alvheim / 25/4-L-5 CY2H

25/4-L-5 CY2H

Development, productionProducingOil

Drilled by Aker BP ASA with Deepsea Nordkapp in Alvheim, 18.12.2023 to 05.01.2024 (18 days), to 6 278,0 m.

Water depth120,0 m
Total depth6 278,0 m MD
Vertical depth2 163,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud18.12.2023
Completed05.01.2024
OperatorAker BP ASA
Position59,5862 N, 2,0886 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Alvheim gradient31,8 °C/km
Estimated at total depth from the gradient68 °C

The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/4-L-5 AH same well0,02 845,0--2023
25/4-L-5 BH same well0,03 548,0--2023
25/4-L-5 CY1H same well0,02 245,0--2023
25/4-L-5 H same well0,02 392,0--2023
25/4-L-3 AY1H0,15 451,0--2011
25/4-L-3 AY2H0,15 807,0--2011
25/4-L-3 H0,13 326,0--2010
25/4-L-1 AH0,13 669,0--2010

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗