25/5-D-1 H
Development, productionClosedGas
Drilled by Total E&P Norge AS with Borgland Dolphin in Atla, 08.06.2012 to 14.06.2012 (6 days), to 2 727,0 m.
Water depth119,0 m
Total depth2 727,0 m MD
Vertical depth2 726,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBorgland Dolphin
Spud08.06.2012
Completed14.06.2012
OperatorTotal E&P Norge AS
Position59,6620 N, 2,5709 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Atla report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.