Drilled by Norsk Hydro Produksjon AS with West Vanguard in Alvheim, 16.07.1997 to 30.08.1997 (45 days), to 2 736,0 m in the Våle Formation.
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 99 °C |
| Drill-stem test at 2 052,0 m | 67 °C |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 86 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/7-A-3 AY1H | 0,5 | 5 330,0 | - | - | 2023 |
| 25/7-A-3 AY2H | 0,5 | 4 944,0 | - | - | 2023 |
| 25/7-A-3 AY3H | 0,5 | 4 973,0 | - | - | 2023 |
| 25/7-A-3 H | 0,5 | 3 265,0 | - | - | 2023 |
| 25/7-A-1 AH | 0,5 | 2 500,0 | - | - | 2023 |
| 25/7-A-1 BY1H | 0,5 | 6 806,0 | - | - | 2023 |
| 25/7-A-1 BY2H | 0,5 | 7 092,0 | - | - | 2023 |
| 25/7-A-1 BY3H | 0,5 | 7 000,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 207,5 | 36" | 209,0 | - |
| Intermediate | 13 3/8" | 1 332,0 | 17 1/2" | 1 338,0 | - |
| Intermediate | 9 5/8" | 1 860,0 | 12 1/4" | 1 866,0 | - |
| Liner | 7" | 2 736,0 | 8 1/2" | 2 736,0 | - |
Mud weight
18 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 2 043,0 - 2 052,0 | 17,5 | 19,0 | 67 | 900 | 78 000 |