Fields / 25/8-21 S
25/8-21 S
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by MOL Norge AS with Transocean Barents, 13.05.2021 to 20.06.2021 (38 days), to 2 703,0 m in the Basement.
Water depth128,0 m
Total depth2 703,0 m MD
Vertical depth2 627,0 m TVD
Bottom-hole temperature105 °C
Max inclination20,6°
Rotary table40,0 m
Formation at total depthBasement
RigTransocean Barents
Spud13.05.2021
Completed20.06.2021
OperatorMOL Norge AS
Position59,3291 N, 2,3403 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 105 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/8-19 A | 1,6 | 2 950,0 | - | - | 2019 |
| 25/8-19 S | 1,6 | 2 760,0 | - | - | 2019 |
| 25/8-22 S | 3,5 | 2 622,0 | 107 °C | 1,28 | 2021 |
| 25/8-13 | 3,9 | 2 276,0 | - | 1,32 | 2001 |
| 25/7-1 S | 4,6 | 3 592,0 | 114 °C | 1,92 | 1986 |
| 25/8-20 A | 4,7 | - | - | - | - |
| 25/8-20 B | 4,7 | 2 698,0 | 93 °C | 1,40 | 2021 |
| 25/8-20 C | 4,7 | 2 060,0 | 77 °C | 1,40 | 2021 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Intermediate | 30" | 233,2 | 36" | 233,2 | - |
| Intermediate | 20" | 1 032,8 | 26" | 1 040,0 | 1,50 FIT |
| Intermediate | 13 5/8" | 2 004,5 | 16" | 2 010,0 | 1,59 LOT |
| Liner | 9 5/8" | 2 440,0 | 12 1/4" | 2 441,0 | 2,03 FIT |
| Open hole | - | 2 524,0 | 8 1/2" | 2 524,0 | 2,33 FIT |
| Open hole | - | 2 703,0 | 8 1/2" | 2 703,0 | - |
Mud weight
12 measurements, one dot each, 1,00 to 1,31 g/cm³ against measured depth, oil, water.