Fields / 25/8-24 S
25/8-24 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Vår Energi ASA with COSLPioneer, 04.10.2026 to 31.10.2026 (27 days), to 4 058,0 m.
Water depth127,3 m
Total depth4 058,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPioneer
Spud04.10.2026
Completed31.10.2026
OperatorVår Energi ASA
Position59,4193 N, 2,3403 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/7-3 | 2,0 | 2 540,0 | 95 °C | 1,50 | 1995 |
| 25/8-U-21 | 2,3 | - | - | - | - |
| 25/8-U-23 | 2,4 | - | - | - | - |
| 25/8-U-25 | 2,4 | 521,0 | - | - | 2012 |
| 25/8-U-22 | 2,4 | - | - | - | - |
| 25/8-D-1 AH | 2,4 | 4 506,0 | - | - | 2012 |
| 25/8-D-1 H | 2,4 | 2 256,0 | - | - | 2012 |
| 25/8-U-24 | 2,4 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.