Fields / Breidablikk / 25/8-4
25/8-4
Exploration, wildcatPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Breidablikk, 25.07.1992 to 11.08.1992 (17 days), to 1 891,0 m in the Hod Formation.
Water depth130,0 m
Total depth1 891,0 m MD
Vertical depth1 891,0 m TVD
Bottom-hole temperature71 °C
Max inclination2,1°
Rotary table25,0 m
Formation at total depthHod Formation
RigVildkat Explorer
Spud25.07.1992
Completed11.08.1992
OperatorNorsk Hydro Produksjon AS
Position59,2587 N, 2,6119 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 71 °C |
| Breidablikk gradient | 40,4 °C/km |
| Estimated at total depth from the gradient | 74 °C |
The gradient is the median of 3 released wells in Breidablikk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-U-27 | 0,7 | - | - | - | 2023 |
| 25/8-L-6 AH | 0,7 | 3 791,0 | - | - | 2024 |
| 25/8-L-6 BH | 0,7 | 4 398,0 | - | - | 2024 |
| 25/8-L-6 H | 0,7 | 3 103,0 | - | - | 2023 |
| 25/8-L-5 H | 0,7 | 4 607,0 | - | - | 2024 |
| 25/8-L-4 AH | 0,7 | - | - | - | - |
| 25/8-L-4 H | 0,7 | - | - | - | 2026 |
| 25/8-L-1 AY1H | 0,7 | 4 520,0 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 241,0 | 36" | 242,0 | - |
| Intermediate | 9 5/8" | 1 300,0 | 12 1/4" | 1 301,0 | 1,70 LOT |
Mud weight
8 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, water based.