25/8-B-25
Development, productionPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Jotun B in Jotun, 20.12.2000 to 10.01.2001 (21 days), to 4 407,0 m.
Water depth127,0 m
Total depth4 407,0 m MD
Vertical depth2 112,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigJotun B
Spud20.12.2000
Completed10.01.2001
OperatorEsso Exploration and Production Norway A/S
Position59,4511 N, 2,3668 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Jotun gradient | 33,3 °C/km |
| Estimated at total depth from the gradient | 68 °C |
The gradient is the median of 4 released wells in Jotun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-B-2 | 0,0 | 2 552,0 | - | - | 1999 |
| 25/8-B-2 A | 0,0 | 4 197,0 | - | - | 1999 |
| 25/8-B-28 | 0,0 | 4 531,0 | - | - | 2003 |
| 25/8-B-28 A | 0,0 | 5 035,0 | - | - | 2003 |
| 25/8-B-28 B | 0,0 | 5 250,0 | - | - | 2003 |
| 25/8-B-20 | 0,0 | 4 500,0 | - | - | 2000 |
| 25/8-B-23 | 0,0 | 3 092,0 | - | - | 2002 |
| 25/8-B-23 A | 0,0 | 3 640,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.