25/8-B-3
Development, productionPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Jotun B in Jotun, 02.09.1999 to 29.09.1999 (27 days), to 4 367,0 m.
Water depth127,0 m
Total depth4 367,0 m MD
Vertical depth2 107,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigJotun B
Spud02.09.1999
Completed29.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,4510 N, 2,3668 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Jotun gradient | 33,3 °C/km |
| Estimated at total depth from the gradient | 68 °C |
The gradient is the median of 4 released wells in Jotun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-B-11 | 0,0 | 5 830,0 | - | - | 2000 |
| 25/8-B-20 | 0,0 | 4 500,0 | - | - | 2000 |
| 25/8-B-24 | 0,0 | - | - | - | - |
| 25/8-B-24 A | 0,0 | - | - | - | - |
| 25/8-B-32 | 0,0 | 4 599,0 | - | - | 2006 |
| 25/8-B-21 | 0,0 | 2 400,0 | - | - | 2002 |
| 25/8-B-21 A | 0,0 | 3 163,0 | - | - | 2002 |
| 25/8-B-21 B | 0,0 | 3 316,0 | - | - | 2002 |
Casing and formation tests