25/8-B-30
Development, productionPlugged and abandonedOil
Drilled by ExxonMobil Exploration and Production Norway AS with Jotun B in Jotun, 15.08.2006 to 26.09.2006 (42 days), to 5 554,0 m.
Water depth127,0 m
Total depth5 554,0 m MD
Vertical depth2 130,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,4 m
Formation at total depth-
RigJotun B
Spud15.08.2006
Completed26.09.2006
OperatorExxonMobil Exploration and Production Norway AS
Position59,4510 N, 2,3669 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Jotun gradient | 33,3 °C/km |
| Estimated at total depth from the gradient | 69 °C |
The gradient is the median of 4 released wells in Jotun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.