25/8-B-8
Development, productionPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Jotun B in Jotun, 11.04.2000 to 02.05.2000 (21 days), to 3 410,0 m.
Water depth127,0 m
Total depth3 410,0 m MD
Vertical depth2 122,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigJotun B
Spud11.04.2000
Completed02.05.2000
OperatorEsso Exploration and Production Norway A/S
Position59,4511 N, 2,3669 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Jotun gradient | 33,3 °C/km |
| Estimated at total depth from the gradient | 69 °C |
The gradient is the median of 4 released wells in Jotun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-B-1 | 0,0 | 3 400,0 | - | - | 1999 |
| 25/8-B-29 | 0,0 | 3 245,0 | - | - | 2002 |
| 25/8-B-29 A | 0,0 | 3 746,0 | - | - | 2003 |
| 25/8-B-4 | 0,0 | 4 210,0 | - | - | 1999 |
| 25/8-B-4 A | 0,0 | 5 134,0 | - | - | 1999 |
| 25/8-B-23 | 0,0 | 3 092,0 | - | - | 2002 |
| 25/8-B-23 A | 0,0 | 3 640,0 | - | - | 2002 |
| 25/8-B-10 | 0,0 | 3 297,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.