25/8-C-16
Development, injectionInjectingWater
Drilled by Esso Exploration and Production Norway A/S with Ringhorne in Balder, 24.03.2003 to 01.04.2003 (8 days), to 1 073,0 m.
Water depth128,5 m
Total depth1 073,0 m MD
Vertical depth1 006,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud24.03.2003
Completed01.04.2003
OperatorEsso Exploration and Production Norway A/S
Position59,2661 N, 2,4499 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 32 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-15 | 0,0 | 1 372,0 | - | - | 2002 |
| 25/8-C-15 A | 0,0 | 3 191,0 | - | - | 2012 |
| 25/8-C-15 B | 0,0 | - | - | - | - |
| 25/8-C-10 | 0,0 | 5 105,0 | - | - | 2004 |
| 25/8-C-10 A | 0,0 | 5 277,0 | - | - | 2004 |
| 25/8-C-10 B | 0,0 | 5 502,0 | - | - | 2024 |
| 25/8-C-11 | 0,0 | 5 992,0 | - | - | 2003 |
| 25/8-C-11 A | 0,0 | 6 042,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.