25/8-C-23
Development, productionPluggedOil
Drilled by ExxonMobil Exploration and Production Norway AS with Ringhorne in Balder, 02.04.2007 to 27.07.2007 (116 days), to 7 800,0 m.
Water depth128,5 m
Total depth7 800,0 m MD
Vertical depth1 805,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud02.04.2007
Completed27.07.2007
OperatorExxonMobil Exploration and Production Norway AS
Position59,2660 N, 2,4498 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-23 A same well | 0,0 | 5 724,0 | - | - | 2011 |
| 25/8-C-23 B same well | 0,0 | 6 414,0 | - | - | 2011 |
| 25/8-C-23 C same well | 0,0 | 5 443,0 | - | - | 2021 |
| 25/8-C-23 D same well | 0,0 | 3 713,0 | - | - | 2025 |
| 25/8-C-23 E same well | 0,0 | - | - | - | - |
| 25/8-C-23 F same well | 0,0 | - | - | - | - |
| 25/8-C-9 | 0,0 | 6 309,0 | - | - | 2004 |
| 25/8-C-10 | 0,0 | 5 105,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.