25/8-C-5 A
Development, productionClosedOil
Drilled by Vår Energi ASA with Ringhorne in Balder, 12.11.2023 to 08.01.2024 (57 days), to 5 191,0 m.
Water depth128,5 m
Total depth5 191,0 m MD
Vertical depth1 792,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud12.11.2023
Completed08.01.2024
OperatorVår Energi ASA
Position59,2661 N, 2,4498 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 58 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-5 same well | 0,0 | 5 133,0 | - | - | 2005 |
| 25/8-C-5 B same well | 0,0 | - | - | - | - |
| 25/8-C-19 | 0,0 | 6 680,0 | - | - | 2011 |
| 25/8-C-19 A | 0,0 | 7 651,0 | - | - | 2011 |
| 25/8-C-19 B | 0,0 | 6 815,0 | - | - | 2012 |
| 25/8-C-19 C | 0,0 | 4 578,0 | - | - | 2022 |
| 25/8-C-19 D | 0,0 | 4 413,0 | - | - | 2025 |
| 25/8-C-19 E | 0,0 | 6 390,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.