25/8-C-8
Development, observationPlugged
Drilled by Esso Exploration and Production Norway A/S with Ringhorne in Balder, 16.07.2003 to 11.08.2003 (26 days), to 5 209,0 m.
Water depth128,5 m
Total depth5 209,0 m MD
Vertical depth1 807,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table60,3 m
Formation at total depth-
RigRinghorne
Spud16.07.2003
Completed11.08.2003
OperatorEsso Exploration and Production Norway A/S
Position59,2661 N, 2,4499 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-C-8 A same well | 0,0 | 5 390,0 | - | - | 2003 |
| 25/8-C-8 B same well | 0,0 | 4 515,0 | - | - | 2021 |
| 25/8-C-19 | 0,0 | 6 680,0 | - | - | 2011 |
| 25/8-C-19 A | 0,0 | 7 651,0 | - | - | 2011 |
| 25/8-C-19 B | 0,0 | 6 815,0 | - | - | 2012 |
| 25/8-C-19 C | 0,0 | 4 578,0 | - | - | 2022 |
| 25/8-C-19 D | 0,0 | 4 413,0 | - | - | 2025 |
| 25/8-C-19 E | 0,0 | 6 390,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.