Fields / 25/8-U-10
25/8-U-10
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Bucentaur, 28.08.1996 to 28.08.1996 (0 days), to 134,7 m.
Water depth126,0 m
Total depth134,7 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud28.08.1996
Completed28.08.1996
OperatorEsso Exploration and Production Norway A/S
Position59,4516 N, 2,3740 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-U-9 | 0,2 | 134,9 | - | - | 1996 |
| 25/8-U-8 | 0,4 | 134,9 | - | - | 1996 |
| 25/8-U-11 | 0,4 | 134,6 | - | - | 1996 |
| 25/8-B-22 | 0,4 | 5 642,0 | - | - | 2000 |
| 25/8-B-22 A | 0,4 | 4 724,0 | - | - | 2000 |
| 25/8-B-31 | 0,4 | 3 969,0 | - | - | 2006 |
| 25/8-B-4 | 0,4 | 4 210,0 | - | - | 1999 |
| 25/8-B-4 A | 0,4 | 5 134,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.