Fields / 25/8-U-20
25/8-U-20
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Bucentaur, 04.07.1997 to 04.07.1997 (0 days), to 167,0 m.
Water depth127,5 m
Total depth167,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud04.07.1997
Completed04.07.1997
OperatorEsso Exploration and Production Norway A/S
Position59,4585 N, 2,3630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/8-5 S | 0,1 | 3 395,0 | 92 °C | 1,50 | 1994 |
| 25/8-5 SR | 0,1 | 3 395,0 | 92 °C | 1,50 | 1997 |
| 25/8-U-9 | 0,8 | 134,9 | - | - | 1996 |
| 25/8-U-1 | 0,8 | 248,0 | - | - | 1996 |
| 25/8-U-7 | 0,9 | 170,0 | - | - | 1996 |
| 25/8-B-12 | 0,9 | 5 848,0 | - | - | 2000 |
| 25/8-B-12 A | 0,9 | 4 925,0 | - | - | 2000 |
| 25/8-B-12 B | 0,9 | 5 000,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.