30/10-A-11
Development, productionPlugged and abandonedGas
Drilled by Esso Exploration and Production Norway A/S with Odin in Odin, 20.05.1984 to 06.06.1984 (17 days), to 2 225,0 m.
Water depth103,0 m
Total depth2 225,0 m MD
Vertical depth2 078,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigOdin
Spud20.05.1984
Completed06.06.1984
OperatorEsso Exploration and Production Norway A/S
Position60,0769 N, 2,1658 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Odin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/10-A-1 | 0,0 | 2 215,0 | - | - | 1984 |
| 30/10-A-10 | 0,0 | 2 759,0 | - | - | 1984 |
| 30/10-A-12 | 0,0 | 2 240,0 | - | - | 1984 |
| 30/10-A-2 | 0,0 | 2 170,0 | - | - | 1984 |
| 30/10-A-3 | 0,0 | 2 310,0 | - | - | 1984 |
| 30/10-A-4 | 0,0 | 2 315,0 | - | - | 1983 |
| 30/10-A-5 | 0,0 | 2 208,0 | - | - | 1984 |
| 30/10-A-7 | 0,0 | 2 460,0 | - | - | 1984 |
Casing and formation tests
No casing programme is reported for this wellbore.