30/11-F-1 H
Development, observationDrilling
Being drilled by Aker BP ASA with Scarabeo 8 in Fulla. Spudded 10.09.2026 and still drilling: day 70.
Water depth112,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud10.09.2026
Completed-
OperatorAker BP ASA
Position60,0005 N, 2,3712 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Fulla gradient | 34,7 °C/km |
The gradient is the median of 5 released wells in Fulla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/11-F-1 AH same well | 0,0 | - | - | - | - |
| 30/11-F-6 H | 0,0 | - | - | - | 2026 |
| 30/11-F-3 H | 0,0 | - | - | - | 2026 |
| 30/11-U-1 | 0,0 | 1 477,0 | - | - | 2021 |
| 30/11-7 | 0,6 | 4 067,0 | 139 °C | 1,95 | 2008 |
| 30/11-7 A | 0,6 | 4 250,0 | 143 °C | 1,91 | 2009 |
| 30/11-U-5 | 1,3 | 1 250,0 | - | - | 2025 |
| 30/11-16 S | 1,3 | 4 477,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.