30/11-W-6 H
Development, productionClosedOil
Drilled by Aker BP ASA with Deepsea Stavanger in Munin, 11.09.2025 to 06.09.2026 (360 days), to 7 013,0 m.
Water depth107,0 m
Total depth7 013,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigDeepsea Stavanger
Spud11.09.2025
Completed06.09.2026
OperatorAker BP ASA
Position60,1117 N, 2,5934 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Munin gradient | 36,0 °C/km |
| Estimated at total depth from the gradient | 251 °C |
The gradient is the median of 12 released wells in Munin with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/11-W-5 H | 0,0 | 4 750,0 | - | - | 2025 |
| 30/11-W-1 H | 0,0 | 6 320,0 | - | - | 2026 |
| 30/11-W-4 AH | 0,0 | 4 885,0 | - | - | 2026 |
| 30/11-W-4 BH | 0,0 | 6 207,0 | - | - | 2026 |
| 30/11-W-4 CH | 0,0 | - | - | - | 2026 |
| 30/11-W-4 DH | 0,0 | - | - | - | - |
| 30/11-W-4 H | 0,0 | 5 440,0 | - | - | 2026 |
| 30/11-W-2 AH | 0,0 | - | - | - | 2026 |
Casing and formation tests
No casing programme is reported for this wellbore.