Fields / Veslefrikk / 30/3-A-4
30/3-A-4
Development, productionPluggedOil
Drilled by Den norske stats oljeselskap a.s with West Vision in Veslefrikk, 05.07.1988 to 09.08.1988 (35 days), to 3 718,0 m.
Water depth175,0 m
Total depth3 718,0 m MD
Vertical depth3 355,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigWest Vision
Spud05.07.1988
Completed09.08.1988
OperatorDen norske stats oljeselskap a.s
Position60,7828 N, 2,8979 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Veslefrikk gradient | 37,3 °C/km |
| Estimated at total depth from the gradient | 122 °C |
The gradient is the median of 6 released wells in Veslefrikk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/3-A-19 | 0,0 | 3 510,0 | - | - | 1993 |
| 30/3-A-19 A | 0,0 | 3 151,0 | - | - | 2003 |
| 30/3-A-19 B | 0,0 | 3 404,0 | - | - | 2005 |
| 30/3-A-19 C | 0,0 | 4 565,0 | - | - | 2010 |
| 30/3-A-4 A same well | 0,0 | 3 765,0 | - | - | 2001 |
| 30/3-8 A | 0,0 | 6 208,0 | - | 1,60 | 2000 |
| 30/3-8 S | 0,0 | 5 120,0 | - | 1,60 | 2000 |
| 30/3-A-10 | 0,0 | 4 193,0 | - | - | 1990 |
Casing and formation tests
No casing programme is reported for this wellbore.