WellplannerNorwegian shelf well data

Fields / Veslefrikk / 30/3-A-5 C

30/3-A-5 C

Development, injectionPlugged and abandonedWater and gas

Drilled by Statoil Petroleum AS with Veslefrikk A in Veslefrikk, 20.01.2015 to 19.02.2015 (30 days), to 4 706,0 m.

Water depth175,0 m
Total depth4 706,0 m MD
Vertical depth3 026,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigVeslefrikk A
Spud20.01.2015
Completed19.02.2015
OperatorStatoil Petroleum AS
Position60,7827 N, 2,8979 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Veslefrikk gradient37,3 °C/km
Estimated at total depth from the gradient108 °C

The gradient is the median of 6 released wells in Veslefrikk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/3-A-5 same well0,04 513,0--1988
30/3-A-5 A same well0,04 151,0--1999
30/3-A-5 B same well0,04 930,0--2006
30/3-A-10,03 323,0--1987
30/3-A-1 A0,04 941,0--2009
30/3-A-1 B0,04 945,0--2010
30/3-A-210,06 118,0--1994
30/3-A-21 A0,05 595,0--2008

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗