Fields / 30/5-4 A
30/5-4 A
Exploration, appraisalPlugged and abandonedGas and condensate
Drilled by OMV (Norge) AS with Maersk Intrepid, 24.09.2022 to 16.11.2022 (53 days), to 5 001,0 m in the Tarbert Formation.
Water depth95,0 m
Total depth5 001,0 m MD
Vertical depth4 781,0 m TVD
Bottom-hole temperature163 °C
Max inclination58,0°
Rotary table55,0 m
Formation at total depthTarbert Formation
RigMaersk Intrepid
Spud24.09.2022
Completed16.11.2022
OperatorOMV (Norge) AS
Position60,5280 N, 2,5801 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 163 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 30/5-4 S same well | 0,0 | 5 068,0 | 163 °C | 1,94 | 2022 |
| 30/5-U-5 | 0,0 | 124,0 | - | - | 2021 |
| 30/5-U-2 | 0,0 | 114,4 | - | - | 2021 |
| 30/5-U-4 | 0,0 | 114,6 | - | - | 2021 |
| 30/5-U-1 | 0,0 | 124,3 | - | - | 2021 |
| 30/5-U-3 | 0,1 | 131,7 | - | - | 2021 |
| 30/5-2 | 4,1 | 4 076,0 | 139 °C | 1,64 | 1996 |
| 30/6-G-43 Y1H | 5,9 | 5 805,0 | - | - | 2005 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Liner | 7" | 5 000,0 | 8 1/2" | 5 001,0 | - |
Mud weight
6 measurements, one dot each, 1,30 to 1,86 g/cm³ against measured depth, cacl2 packer fluid, rheguard hthp, rheguard prime.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 4 706,6 - 4 858,4 | 10,0 | 80,8 | - | 44 | - |