WellplannerNorwegian shelf well data

Fields / 30/6-11

30/6-11

Exploration, wildcatPlugged and abandonedShows

Drilled by Norsk Hydro Produksjon AS with Nortrym, 20.12.1982 to 30.03.1983 (100 days), to 4 001,0 m in the Statfjord Group.

Water depth121,0 m
Total depth4 001,0 m MD
Vertical depth4 001,0 m TVD
Bottom-hole temperature132 °C
Max inclination6,5°
Rotary table25,0 m
Formation at total depthStatfjord Group
RigNortrym
Spud20.12.1982
Completed30.03.1983
OperatorNorsk Hydro Produksjon AS
Position60,7248 N, 2,7449 E

Formations

19 tops reported, measured depth in metres.

GroupsNordland Group, top 146,0 mNordland GpHordaland Group, top 909,0 mHordaland GpRogaland Group, top 2 055,0 mRogaland GpShetland Group, top 2 351,0 mShetland GpViking Group, top 3 260,0 mBrent Group, top 3 351,0 mBrent GpDunlin Group, top 3 561,0 mDunlin GpStatfjord Group, top 3 892,5 mFormationsUtsira Formation, top 720,0 mUtsira FmBalder Formation, top 2 055,0 mSele Formation, top 2 127,0 mLista Formation, top 2 239,0 mVåle Formation, top 2 333,0 mVåle FmDraupne Formation, top 3 260,0 mHeather Formation, top 3 264,0 mNess Formation, top 3 351,0 mEtive Formation, top 3 459,0 mEtive FmCook Formation, top 3 752,0 mAmundsen Formation, top 3 768,0 mAmundsen Fm1461 0002 0003 0004 0004 001

Temperature

Reported at total depth132 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-300,93 493,0-1,492018
30/6-24 S3,93 986,0140 °C1,461991
30/3-47,73 287,0152 °C1,511985
30/3-4 R7,73 287,0128 °C-2001
30/6-167,93 300,0126 °C1,401984
30/3-98,04 015,0142 °C1,912000
30/3-10 S8,54 168,0152 °C2,002009
30/5-3 A8,84 746,0-1,862009

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"235,036"235,0-
Surface casing20"951,026"965,01,76 LOT
Intermediate13 3/8"2 106,017 1/2"2 165,01,70 LOT
Intermediate9 5/8"3 639,012 1/4"3 654,01,93 LOT
Open hole-4 000,08 3/8"4 001,0-

Mud weight

8 measurements, one dot each, 1,00 to 1,44 g/cm³ against measured depth, waterbased.

1,01,11,21,31,41,501 0002 0003 0004 000220,0 m: 1,06 g/cm³, waterbased710,0 m: 1,11 g/cm³, waterbased1 190,0 m: 1,21 g/cm³, waterbased1 980,0 m: 1,23 g/cm³, waterbased2 570,0 m: 1,34 g/cm³, waterbased3 110,0 m: 1,44 g/cm³, waterbased3 680,0 m: 1,43 g/cm³, waterbased4 001,0 m: 1,40 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
13 449,0 - 3 455,0-----
Show on the mapOpen on FactPages ↗