30/6-13 R
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Norsk Hydro Produksjon AS with Treasure Hunter in Oseberg, 08.09.1986 to 11.09.1986 (3 days), to 2 775,0 m in the Drake Formation.
Water depth105,0 m
Total depth2 775,0 m MD
Vertical depth2 775,0 m TVD
Bottom-hole temperature85 °C
Max inclination1,8°
Rotary table25,0 m
Formation at total depthDrake Formation
RigTreasure Hunter
Spud08.09.1986
Completed11.09.1986
OperatorNorsk Hydro Produksjon AS
Position60,5541 N, 2,8227 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 85 °C |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-13 same well | 0,0 | 2 775,0 | 107 °C | 1,25 | 1983 |
| 30/6-12 | 0,0 | 615,0 | - | 1,05 | 1983 |
| 30/9-B-49 H | 1,5 | 2 843,0 | - | - | 1986 |
| 30/9-B-50 H | 1,7 | 3 410,0 | - | - | 1987 |
| 30/6-1 | 2,5 | 3 175,0 | 91 °C | 1,51 | 1979 |
| 30/6-31 S | 2,6 | 2 852,0 | - | - | 2020 |
| 30/6-U-28 | 2,6 | 511,0 | - | - | 2020 |
| 30/6-2 | 3,5 | 2 890,0 | 78 °C | 1,50 | 1979 |
Casing and formation tests
No casing programme is reported for this wellbore.