WellplannerNorwegian shelf well data

Fields / Oseberg / 30/6-C-10

30/6-C-10

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Oseberg, 27.12.1988 to 18.02.1989 (53 days), to 3 380,0 m.

Water depth108,6 m
Total depth3 380,0 m MD
Vertical depth2 896,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,5 m
Formation at total depth-
RigTransocean 8
Spud27.12.1988
Completed18.02.1989
OperatorNorsk Hydro Produksjon AS
Position60,6082 N, 2,7759 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Oseberg gradient38,1 °C/km
Estimated at total depth from the gradient109 °C

The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
30/6-C-10 A same well0,03 433,0--1995
30/6-C-10 B same well0,05 180,0--1995
30/6-C-10 C same well0,05 256,0--1996
30/6-C-10 D same well0,04 485,0--2005
30/6-C-10 E same well0,06 020,0--2009
30/6-C-10 EY2 same well0,0----
30/6-C-10 F same well0,05 347,0--2018
30/6-C-10 G same well0,05 226,0--2020

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗