Fields / Oseberg Øst / 30/6-E-12
30/6-E-12
Development, injectionPluggedWater
Drilled by Norsk Hydro Produksjon AS with Oseberg Øst in Oseberg Øst, 27.08.2000 to 22.09.2000 (26 days), to 4 970,0 m.
Water depth158,0 m
Total depth4 970,0 m MD
Vertical depth3 062,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table64,0 m
Formation at total depth-
RigOseberg Øst
Spud27.08.2000
Completed22.09.2000
OperatorNorsk Hydro Produksjon AS
Position60,7005 N, 2,9353 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg Øst gradient | 40,3 °C/km |
| Estimated at total depth from the gradient | 118 °C |
The gradient is the median of 4 released wells in Oseberg Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-E-12 A same well | 0,0 | 5 982,0 | - | - | 2017 |
| 30/6-E-15 | 0,0 | 6 228,0 | - | - | 2001 |
| 30/6-E-15 A | 0,0 | 7 060,0 | - | - | 2001 |
| 30/6-E-15 B | 0,0 | 6 889,0 | - | - | 2018 |
| 30/6-E-11 | 0,0 | 4 002,0 | - | - | 2001 |
| 30/6-E-11 A | 0,0 | 6 410,0 | - | - | 2001 |
| 30/6-E-11 B | 0,0 | 4 030,0 | - | - | 2002 |
| 30/6-E-11 C | 0,0 | 4 730,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.