30/6-H-9
Development, observationPluggedOil
Drilled by Statoil Petroleum AS with Askepott in Oseberg, 13.04.2018 to 02.07.2019 (445 days), to 4 747,0 m.
Water depth108,6 m
Total depth4 747,0 m MD
Vertical depth2 542,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,2 m
Formation at total depth-
RigAskepott
Spud13.04.2018
Completed02.07.2019
OperatorStatoil Petroleum AS
Position60,5485 N, 2,7334 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Oseberg gradient | 38,1 °C/km |
| Estimated at total depth from the gradient | 95 °C |
The gradient is the median of 29 released wells in Oseberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 30/6-H-9 A same well | 0,0 | 4 663,0 | - | - | 2019 |
| 30/6-H-10 | 0,0 | 5 517,0 | - | - | 2020 |
| 30/6-H-8 | 0,0 | 3 584,0 | - | - | 2018 |
| 30/6-H-8 AY1 | 0,0 | 4 889,0 | - | - | 2018 |
| 30/6-H-8 AY2 | 0,0 | 4 859,0 | - | - | 2018 |
| 30/6-H-2 | 0,0 | 3 566,0 | - | - | 2018 |
| 30/6-H-2 A | 0,0 | 4 093,0 | - | - | 2018 |
| 30/6-H-2 B | 0,0 | 3 269,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.